ICP
  • About
    • ICP for Programs, Financiers, and Green Banks >
      • GHG Accounting
      • Adaptive Reuse
      • Certification Timing
      • Post-Cert Changes
    • How Does ICP Work? >
      • Project Framework
      • Roadmap to IREE Certification
    • GGRF EPA Reporter
    • Tech Forum >
      • Technical Forum Blog
      • Discussion Notes
      • Call Recordings
      • Reference Documents
      • Glossary
      • Acronyms
      • Protocol Archives
    • ICP in Canada
    • Contact Us
  • Training
  • IREE Certification
    • Guide to IREE Certification
    • Commercial Protocols >
      • Large Commercial
      • Standard Commercial
      • Targeted Commercial
      • Basic / Performance
    • Multifamily Protocols >
      • Large Multifamily
      • Standard Multifamily
      • Targeted Multifamily
      • Basic / Performance
    • Project Development Specification
    • Project Registration >
      • Performance Update
    • Tools and Templates >
      • Cx, O&M, M&V Templates
      • QA Checklists
      • Building Button
    • Case Studies
  • Providers
    • Project Developer Network >
      • Join the ICP PD Network
    • Quality Assurance Assessors >
      • Join ICP's Quality Assurance Asserssors
  • Blog
    • Blog
    • ICP In the News

ICP Makes Cx, O&M, and M&V Plans Easy

11/21/2015

 
Picture
ICP Project Development Templates are first of a kind ready-to-use templates that take the time and cost out of developing the key performance period plans required for Certified Investor Ready Energy Efficiency™ projects. Developed in collaboration with stakeholders, these templates have been designed for users to customize the contents and language to fit owner or project specific requirements, and generally based on information already developed for the project.
​
ICP requires that at the time of IREE™ Certification these actionable plans are in place, so that building owners and investors can ensure that projects are implemented, maintained, and measured through the performance period of thier projects to make sure they achieve thier energy savings potential. The ICP system provides the plan as part of the underwriting pacakge, but we rely on those taking risk on the savings to ensure that the plans are executed on.

We are pleased to release templates for Operational Performance Verification (targeted commissioning), Operations Maintenance and Monitoring, and Measurement and Verification. 

Picture
icp_cx__opv__plan_v.1_-_template.docx
File Size: 57 kb
File Type: docx
Download File

Operational Performance Verification (OPV) Plan Template: 
The OPV plan can be used directly to describe the targeted commissioning process to support Investor Confidence Project (ICP) compliant projects that use either in-house or third-party commissioning providers. 
Picture
icp_om_m_plan_v.1_-_template.docx
File Size: 44 kb
File Type: docx
Download File

Operations, Maintenance and Monitoring (OM&M) Plan Template: 
​This OM&M plan template provides a framework and outline for creating a project specific OM&M plan. The OM&M plan can be used directly to describe the OM&M process to support 
Investor Confidence Project (ICP) compliant projects. This OM&M plan can be used as a stand-alone document, or included as an appendix to the commissioning (OPV) plan.
Picture
icp_option_c_m_v_plan_v1.0_-_template.docx
File Size: 40 kb
File Type: docx
Download File

Measurement and Verification (M&V) Plan Template, Option C: 
​This M&V plan template provides a framework and outline for creating a project-specific M&V plan adherent to the 
IPMVP Option C, Whole Facility approach. The M&V plan can be used directly to describe the M&V process to support Investor Confidence Project (ICP) compliant projects. This M&V Plan template was developed with contributions by David Jump of Quantum Energy Services & Technologies, Inc. (QuEST), and the EVO IPMVP Committee.

Templates for IPMVP Option A and Option B are under development, check back soon!

    RSS Feed

    Archives

    April 2025
    November 2024
    May 2024
    July 2023
    July 2021
    June 2019
    March 2019
    March 2018
    January 2018
    December 2017
    October 2017
    August 2017
    January 2017
    December 2016
    October 2016
    August 2016
    July 2016
    June 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    April 2015
    March 2015
    February 2015
    December 2014
    November 2014
    October 2014
    September 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    March 2013
    January 2013
    December 2012
    October 2012

    Categories

    All
    179d
    25e
    Ab758
    Benchmarking
    California Energy Commission
    Carbon Credit
    Cec
    Credentialing
    Edf
    Eepp
    Energy Software
    Femp
    Icp
    Insurance
    Leasing
    Low Income Weatherization
    Measurement And Verification
    M&V
    Pace
    Performance
    Ppa
    Risk Management
    Software
    Software Providers
    Solar
    Tax Credits
    Ump
    Uniform Methods Project
    Wap

Contact the Project