ICP
  • About
    • ICP for Programs, Financiers, and Green Banks >
      • GHG Accounting
      • Adaptive Reuse
      • Certification Timing
      • Post-Cert Changes
    • How Does ICP Work? >
      • Project Framework
      • Roadmap to IREE Certification
    • GGRF EPA Reporter
    • Tech Forum >
      • Technical Forum Blog
      • Discussion Notes
      • Call Recordings
      • Reference Documents
      • Glossary
      • Acronyms
      • Protocol Archives
    • ICP in Canada
    • Contact Us
  • Training
  • IREE Certification
    • Guide to IREE Certification
    • Commercial Protocols >
      • Large Commercial
      • Standard Commercial
      • Targeted Commercial
      • Basic / Performance
    • Multifamily Protocols >
      • Large Multifamily
      • Standard Multifamily
      • Targeted Multifamily
      • Basic / Performance
    • Project Development Specification
    • Project Registration >
      • Performance Update
    • Tools and Templates >
      • Cx, O&M, M&V Templates
      • QA Checklists
      • Building Button
    • Case Studies
  • Providers
    • Project Developer Network >
      • Join the ICP PD Network
    • Quality Assurance Assessors >
      • Join ICP's Quality Assurance Asserssors
  • Blog
    • Blog
    • ICP In the News

Standard Commercial Protocol

ICP Protocol - ​​Standard Commercial

Download ICP-SC Protocol
The ICP Protocol for Standard Commercial is designed for commercial energy efficiency projects consisting of multiple measures costing typically under $1M in project costs where engineering requirements must be scaled to fit performance risk.  These projects are typically considered "high performing projects" where the projected energy savings typically cover the project investment cost.  

This protocol allows for the use of various open-book calculation methods and requires M&V based on either IPMVP Options A / B or IPMVP Option C.  For buildings requiring a more holistic approach including the use of an energy model, or the IPMVP Option C approach, the specific/requirements for these savings calculation and M&V components can be found in the ICP Large Commercial  Protocol.
​
​Selecting the most appropriate protocol is one of the first steps in your ICP project journey. Retrofit projects are not simple to classify, so Project Developers should work with their Quality Assurance Providers and Investors to select the best protocol for each project based on that project's size, scope, and risk profile. The goal is to achieve "substantial" compliance with all requirements of the selected protocol; however, working with a professional engineer as a selected third-party quality assurance provider, protocols can be adapted to fit each project so long as any changes are documented in notes to the QAA check-list, and do not substantially affect the accuracy and rigor of the certification.
Picture
Picture

Contact the Project