ICP
  • About
    • ICP for Programs, Financiers, and Green Banks >
      • GHG Accounting
      • Adaptive Reuse
      • Certification Timing
      • Post-Cert Changes
    • How Does ICP Work? >
      • Project Framework
      • Roadmap to IREE Certification
    • GGRF EPA Reporter
    • Tech Forum >
      • Technical Forum Blog
      • Discussion Notes
      • Call Recordings
      • Reference Documents
      • Glossary
      • Acronyms
      • Protocol Archives
    • ICP in Canada
    • Contact Us
  • Training
  • IREE Certification
    • Guide to IREE Certification
    • Commercial Protocols >
      • Large Commercial
      • Standard Commercial
      • Targeted Commercial
      • Basic / Performance
    • Multifamily Protocols >
      • Large Multifamily
      • Standard Multifamily
      • Targeted Multifamily
      • Basic / Performance
    • Project Development Specification
    • Project Registration >
      • Performance Update
    • Tools and Templates >
      • Cx, O&M, M&V Templates
      • QA Checklists
      • Building Button
    • Case Studies
  • Providers
    • Project Developer Network >
      • Join the ICP PD Network
    • Quality Assurance Assessors >
      • Join ICP's Quality Assurance Asserssors
  • Blog
    • Blog
    • ICP In the News

How to Use the Project Development Specification (its easy)

11/11/2014

Comments

 
Picture
The ICP Project Development Specification (PD Spec) can be a bit intimidating. Clocking in at 67 pages, it can seem a bit overwhelming. So we wanted to explain how to use the PD Spec as a tool for project developers and quality assurance professionals in your day-to-day application of ICP and as a useful tool to help you do your job.

If you are a Project Developer, this is your cheat-sheet. You can go to the specification for a clear narrative and detailed resources that lay out exactly what is being asked of you, and what it will take to develop an ICP compliant project.

If you are a Quality Assurance Provider (either an independent engineer or working within a program), the PD Spec represents the “right” answers. So when you evaluate a project for compliance, you can evaluate each step relative to a fixed target.

Using The ICP Project Development Specification

First off, you do NOT need to print out the Specification and read it from cover-to-cover (though you are free to do so if you please!).

Instead, we have reissued all of our ICP Protocols to include links after each requirement that direct you to the relevant section of the PD Spec to explain exactly what is required. So as you prepare a project using the protocols as your guide, you can easily jump from whatever protocol you are using directly to the appropriate section of the PD Spec to find out in detail what is required.

Give it a TRY!  below is a version of our Large Commercial v1.2a protocol. Scroll down to any section of the document, pick a requirement and look for a link like this: [PD sec X.Y.Z]. That link connects every requirement directly to the relevant section of the PD Spec. Give it a click and watch the magic happen!

Comments
comments powered by Disqus

    RSS Feed

    Archives

    April 2025
    November 2024
    May 2024
    July 2023
    July 2021
    June 2019
    March 2019
    March 2018
    January 2018
    December 2017
    October 2017
    August 2017
    January 2017
    December 2016
    October 2016
    August 2016
    July 2016
    June 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    April 2015
    March 2015
    February 2015
    December 2014
    November 2014
    October 2014
    September 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    March 2013
    January 2013
    December 2012
    October 2012

    Categories

    All
    179d
    25e
    Ab758
    Benchmarking
    California Energy Commission
    Carbon Credit
    Cec
    Credentialing
    Edf
    Eepp
    Energy Software
    Femp
    Icp
    Insurance
    Leasing
    Low Income Weatherization
    Measurement And Verification
    M&V
    Pace
    Performance
    Ppa
    Risk Management
    Software
    Software Providers
    Solar
    Tax Credits
    Ump
    Uniform Methods Project
    Wap

Contact the Project