ICP
  • About
    • ICP for Programs, Financiers, and Green Banks >
      • GHG Accounting
      • Adaptive Reuse
      • Certification Timing
      • Post-Cert Changes
    • How Does ICP Work? >
      • Project Framework
      • Roadmap to IREE Certification
    • GGRF EPA Reporter
    • Tech Forum >
      • Technical Forum Blog
      • Discussion Notes
      • Call Recordings
      • Reference Documents
      • Glossary
      • Acronyms
      • Protocol Archives
    • ICP in Canada
    • Contact Us
  • Training
  • IREE Certification
    • Guide to IREE Certification
    • Commercial Protocols >
      • Large Commercial
      • Standard Commercial
      • Targeted Commercial
      • Basic / Performance
    • Multifamily Protocols >
      • Large Multifamily
      • Standard Multifamily
      • Targeted Multifamily
      • Basic / Performance
    • Project Development Specification
    • Project Registration >
      • Performance Update
    • Tools and Templates >
      • Cx, O&M, M&V Templates
      • QA Checklists
      • Building Button
    • Case Studies
  • Providers
    • Project Developer Network >
      • Join the ICP PD Network
    • Quality Assurance Assessors >
      • Join ICP's Quality Assurance Asserssors
  • Blog
    • Blog
    • ICP In the News

ICP Technical Forum September 16th - A Discussion of Common Project Gaps

9/10/2015

Comments

 
Picture
On September 16th, at noon EST, the ICP Technical Forum will be focusing on current requirements of the ICP protocols that have presented some challenges to the "business-as-usual" approach to Energy Efficiency Project Development. Common items that have been brought up during the development of initial ICP-compliant projects, which will be discussed during this Technical Forum call, include:
  • Savings Calculations - sharing "live" spreadsheet calculations.
  • Operational Performance Verification (OPV, or commissioning) Plans - what is required in an OPV/Cx plan, and how elements of the plan need to be developed as the project progresses.
  • Operations, Maintenance and Monitoring Plans - what are appropriate methods to ensure persistence of savings, and what is needed in an OM&M plan.
  • Measurement and Verification Plans - what is required to demonstrate adherence to IPMVP criteria.
The Technical Forum call will also revisit the discussion  held during the August call, regarding normalization of baseline data, and whether non-normalized baselines can be developed for projects that warrant / justify this approach.
Please join us on September 16th, noon EST, to discuss these topics, and bring your own questions or concerns regarding challenges that the ICP approach might present for your projects and methods.

Comments
comments powered by Disqus

    Follow Tech Forum Blog:



    Curated by:

    Tracy Phillips
    ICP Technical Lead


    Archives

    May 2016
    March 2016
    December 2015
    September 2015
    August 2015
    April 2015
    February 2015
    January 2015
    December 2014
    October 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014

    Categories

    All
    Data Access And Management
    Large Commercial
    Quality Assurance
    Standard Commercial

    RSS Feed

Contact the Project