ICP
  • About
    • ICP for Programs, Financiers, and Green Banks >
      • GHG Accounting
      • Adaptive Reuse
      • Certification Timing
      • Post-Cert Changes
    • How Does ICP Work? >
      • Project Framework
      • Roadmap to IREE Certification
    • GGRF EPA Reporter
    • Tech Forum >
      • Technical Forum Blog
      • Discussion Notes
      • Call Recordings
      • Reference Documents
      • Glossary
      • Acronyms
      • Protocol Archives
    • ICP in Canada
    • Contact Us
  • Training
  • IREE Certification
    • Guide to IREE Certification
    • Commercial Protocols >
      • Large Commercial
      • Standard Commercial
      • Targeted Commercial
      • Basic / Performance
    • Multifamily Protocols >
      • Large Multifamily
      • Standard Multifamily
      • Targeted Multifamily
      • Basic / Performance
    • Project Development Specification
    • Project Registration >
      • Performance Update
    • Tools and Templates >
      • Cx, O&M, M&V Templates
      • QA Checklists
      • Building Button
    • Case Studies
  • Providers
    • Project Developer Network >
      • Join the ICP PD Network
    • Quality Assurance Assessors >
      • Join ICP's Quality Assurance Asserssors
  • Blog
    • Blog
    • ICP In the News

Thanks to everyone who was part of our conference call on November 5th.  Below are a series of follow-up items based on what we discussed.  


Please take a moment to provide some feedback so we can keep up the momentum:

Presentation from Call
File Size: 2070 kb
File Type: pptx
Download File

    ICP Advisory Team Meeting Follow-Up

    Please provide company name, as well as contact. If possible, please be willing to facilitate an introduction.
    Please provide company name, as well as contact. If possible, please be willing to facilitate an introduction.
    Please provide company name, as well as contact. If possible, please be willing to facilitate an introduction.
Submit


Latest ICP Draft for Review (please include comments in form above)

energy_efficiency_performance_protocol_-_large_commercial_nov_2012.docx
File Size: 175 kb
File Type: docx
Download File


Connecticut PACE Documents (please include comments in form above)

ct_pace_tech_stds_draft_v5_09-20-12.doc
File Size: 96 kb
File Type: doc
Download File

cefia_flowchart_v4_12_sep12.pdf
File Size: 52 kb
File Type: pdf
Download File

sample_scenario_report_office_bldg_09-13-12.pdf
File Size: 120 kb
File Type: pdf
Download File


Feel free to contact Matt Golden directly at:

Matt Golden
[email protected]
415.902.4546

Or suggest a time for a call at:  Schedule a Meeting

Contact the Project