ICP
  • About
    • ICP for Programs, Financiers, and Green Banks >
      • GHG Accounting
      • Adaptive Reuse
      • Certification Timing
      • Post-Cert Changes
    • How Does ICP Work? >
      • Project Framework
      • Roadmap to IREE Certification
    • GGRF EPA Reporter
    • Tech Forum >
      • Technical Forum Blog
      • Discussion Notes
      • Call Recordings
      • Reference Documents
      • Glossary
      • Acronyms
      • Protocol Archives
    • ICP in Canada
    • Contact Us
  • Training
  • IREE Certification
    • Guide to IREE Certification
    • Commercial Protocols >
      • Large Commercial
      • Standard Commercial
      • Targeted Commercial
      • Basic / Performance
    • Multifamily Protocols >
      • Large Multifamily
      • Standard Multifamily
      • Targeted Multifamily
      • Basic / Performance
    • Project Development Specification
    • Project Registration >
      • Performance Update
    • Tools and Templates >
      • Cx, O&M, M&V Templates
      • QA Checklists
      • Building Button
    • Case Studies
  • Providers
    • Project Developer Network >
      • Join the ICP PD Network
    • Quality Assurance Assessors >
      • Join ICP's Quality Assurance Asserssors
  • Blog
    • Blog
    • ICP In the News

Design, Construction, Commissioning

The design and construction team must commit to realize the intent of the energy audit recommendations accepted by the Project Owner. That this commitment is met will be part of the project’s commissioning (Cx).   New retro-fitted systems must be commissioned to ensure that:
  1. The installation conforms to what was intended and specified.
  2. The equipment and systems are operating correctly, as specified, demonstrated by tests.
  3. System documentation has been provided and operators have been trained.  
There are various industry standards that adequately define the new-construction commissioning process that should be applied to new retrofitted systems.  Acceptable references include ASHRAE Guideline 0/1, Building Commissioning Association, and the California Commissioning Collaborative.  The project must select one such acceptable industry guideline and design and perform commissioning consistent with that guideline. 